This blog is created with joint team work between Hanuma Rupakula and Mahesh Sardesai.
Please refer 3393679 - Jump Start Your SAP S/4HANA 2023 Implementation by Activating SAP Best Practices which will guide you in preparing for implementation of S/4HANA using SAP Best Practices content.
WARNING: This blog provides guidance for activating S/4HANA 2023 FPS0 Best Practices when a client is setup as Best Practice client. If you set up a merged client as per Alternative 2 - Setting up a merged client (all client 000 reference settings), follow the activation guidance as per SAP Note 3346909 - Implementation of SAP S/4HANA SAP Best Practices 2023 (Private Cloud and On-Premi... (steps shown in this color)
NOTE: for Best practices activation purpose we recommend to use latest SAPGui, In case you are using SapGui version 7.50, you need to uncheck "Accept Belize theme". Once the Best practices activation is completed, you can activate the SAP Fiori visual theme back. This is shown later under SAP SAPGUI settings.
Please find other blogs as follows at S/4HANA SQUARE ONE
SAP S/4HANA SQUARE ONE |
NEW INSTALLATION | PART1 - MP | PART2 - Installation | PART3 - BP Activation | PART4 - Fiori Activation | PART5 - DATA MIGRATION |
S/4HANA 2023 | fps0 | fps0 | fps0 | fps0 | |
S/4HANA 2022 | fps2 fps1 fps0 | fps2 fps1 fps0 | fps2 fps1 fps0 | fps2 fps1 fps0 | |
S/4HANA 2021 | fps2 fps1 fps0 | fps2 fps1 fps0 | fps2 fps1 fps0 | fps2 fps1 fps0 | |
S/4HANA 2020 | fps2 fps1 fps0 | fps2 fps1 fps0 | fps2 fps1 fps0 | fps2 fps1 fps0 | fps0 |
Copied client to have no currency in tCode SCC4.
CLIENT COPY VALIDATION: Please check table entries using tCode SE16, table (1) T001, click on (2) Number of entries to check number of entries. If there are (3) zero entries as below it is a Best Practices client.For Merged Client you should have some records in this table.
STEP 5: You may like to add Solution Builder to your Favorites in SAP Menu.as this is the transaction you will use until the activation is complete. Also add transaction SECATT. You can remove them from favorites after activation if not needed.
Review SAP Note 3330286 - SAP Best Practices for SAP S/4HANA 2023 Cloud, private edition FP-Stack 00 (10/20...
Upload zip file from URLs in the above note to server.
Add transport request to buffer EERK033517 and EERK049970 with steps below tCode STMS, Import Overview,
After the transport is in buffer, select the transport and import, In the Options tab checkmark Ignore Invalid component version
STEP 6: Create users for content activation as per admin guide with details. Ensure Logon Language and Timezone (should not be empty, any timezone is ok).
STEP 7: Change SAP Profile parameters as below and restart SAP:
abap/heap_area_dia = 6442450944
sapgui/user_scripting = TRUE
rdisp/scheduler/prio_high/max_runtime = 18000
USER SETTINGS:
STEP 8: Import solutions from SAP Best Practices content. Enter tCode /N/SMB/BBI. Choose menu Solution -> Import -> Solution (XML) -> From reference content
Select Solution Builder Content ID BP_OP_ENTPR_S4HANA2023_USV10.XML from below
After import is complete log will be displayed. Click on icon Back
STEP 9: Defining the scope of your solution. (1) Copy Solution BP_OP_ENTPR_S4HANA2023_USV10 to (2) Z_MY_SOLUTION_US
Please click OK to exit.
Click on Favorite to make the solution Z_MY_SOLUTION_US as your favorite.
From the menu, choose Solution => Import => Installation Data => From reference content. Double click on INST_FILES_US_BP_S4BL_S4HANA2023_OP.ZIP
STEP 10: If only you need to remove scope items, double Click (or click on Change Icon) on Z_MY_SOLUTION_US to unselect the scope items from the list.
Descope the Decentralized EWM scope items:4RO, 4RP, 4RQ, 4RR, 4RS and 4UA as they are required only in a decentral EWM system. Also descope the UPA (Universal Parallel Accounting) scope items 3F0, 5W2, 6DF, 6DR, 6DS, 6DT, 6DU, 6EB, 6EC, 6ED, 6EE, 6EF, 6EG and 6VQ.
STEP 11: Enter tCode /n/SMB/SCOPE, Click button (1) New Entries, (2) Customer Solution and (3) select the Country and Solution as below:
Choose Save.
Now you can see that for Z_MY_SOLUTION_US the last icon shows with mouseover shows "Fully Uploaded Central Data Unchecked".
STEP 12: enter tCode SCC4 and ensure below values - Logical System - S4HCLNT100 (needed for EWM steps as per 3.5.1.4 of Admin Guide AdminGuideS4HANAImpl_HELP_EN.pdf in link), Currency - blank, Client role - Test or Customizing depending on the client role
STEP 13(OPTIONAL): Best Practices content activation for any solution will populate the client currency as USD by default. In case you want to have a different client currency, you should change the currency before activation starts.You should not change client currency once the first solution in the client is activated. The procedure is as follows:
Enter tCode /N/SMB/CD_MAINT
In the All Central Data Entities section, use (1) search to find (2) DSC in the table and double-click it, Click (3) Change and change the (4) ID field.
When activating several SAP Best Practices country solutions please follow the procedure provided in 2022 OP Admin guide.
STEP 14: Please do all the steps needed for Pre-activation settings for EWM scope items as per Admin Guide as per the admin guide in the link
If you have activated business functions FICAC_CI and FICAC_CORE, do the steps as per Pre-Activation Settings for Contract Accounting and Convergent Invoicing in Admin Guide.
STEP15: Depending on scope items you have selected, you may get less errors than shown in steps below. The timings are based on Cloud based Virtual Machine with 256GB RAM x 32 Cores. In the SECATT transaction there are certain number of log entries which are sown against each stop.
REMINDER: If you are activating in merged client please perform the pre-requisite steps as provided in the note follow the activation guidance as per SAP Note 3346909 - Implementation of SAP S/4HANA SAP Best Practices 2023 (Private Cloud and On-Premi... (steps shown in this color)
STEP16: Enter tCode /n/SMB/BBI and go to Solution Builder. Select the Solution and click on Implementation Assistant and Click on button Activate.After 3 minutes you will be prompted with screen below.
You can select Skip this screen if you don’t want this screen from popping up everytime.
TIP: In case you would like to migrate data to the new system then please uncheck "With Demo Data". You can use blog - New Installation of S/4HANA 2020 FPS0 – Part 5 – Direct Data Transfer using Migration Cockpit (to be created for S/4HANA 2022) for rapid data migration using direct data transfer.
If a message pops up “To activate the project, the client settings need to be changed to eCATT and CATT allowed” please choose Yes. This would come up if you didn’t follow the earlier step in SCC4.
This is a warning to confirm that you have configured the Group Currency. Please follow the steps given in the Admin Guide if you need to change the group currency from standard delivered USD.
From this point forward it is not possible to change it. (1) Close the dialog and (2) Click on Confirm Manual Step to continue activation.
During the activation if a warning appears then choose OK to continue.
You will get Notification Dialog as shown below:No steps to be done here, just click on on OK to continue.
Click on OK.
Click OK to continue
Click OK to continue
Click OK to continue
You may get error on scope item 3AS as below:
Please do not confirm the step. Click on Activate.
You may get this error a couple of more times during the activation even after next 2 stops. please activate again to process the error.
Click Yes to continue
Navigate to solution builder /n/smb/bbi. On the Interruption popup, choose Yes to continue.
Start the activation in Implementation Assistant again.
STEP17: COMPLETION OF ACTIVATION At the end of activation you should get message “Solution Z_MY_SOLUTION_US is activated”. CONGRATULATIONS !!!!
Please revert the parameter for rdisp/scheduler/prio_high/max_runtime, abap/heap_area_dia and adjust SAPGUI scripting as well as remove SAP_ALL authorization from functional users if granted separately.
STEP18: POST ACTIVATION - EXECUTING MANUAL REWORK ACTIVITIES:
This step should be done in DEV to create a solution for manual rework activities to general xml file for manual rework activities. This is simply a list of steps to be performed in Q just like a word document.
Please follow procedure as described in Admin Guide section 3.6 Executing manual rework activities.
Access tCode /n/SMB/BBI, select the solution you activated and set it to favorite. In the menu bar choose Solution -> Procedure -> Start a procedure. In the Execute a Solution Processing Procedure dialog box choose procedure Manual Rework Required and choose OK.
STEP19: SYSTEM LANDSCAPE MANAGEMENT FOR QAS AND PROD:
Recommendation is not to do Content Activation of best practices in QAS and PROD. You have to move the transports as below in graphic.
In The QAS system, move transports to QAS first n above sequence.
Please note that as of release 1909, configuration guides will be deprecated in the SAP Best Practices for SAP S/4HANA package.
As per the error message in the activation.
Administration Guide for Implementation
This blog has been created with joint team work between Hanuma Rupakula and Mahesh Sardesai.
Hanuma Rupakula
Delivery Manager (LOB Finance Content)
hanumachastry.rupakula@sap.com
and
Mahesh Sardesai
Product Expert - SAP S4HANA Solutions
Brought to you by the SAP S/4HANA Regional Implementation Group
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
11 | |
8 | |
7 | |
4 | |
4 | |
3 | |
2 | |
2 | |
2 | |
2 |