on 2008 May 21 10:00 AM
Dear All,
I have made all the settings for ATP Check in my CRM system, and this works fine. I am able to see the material replenishment lead time being picked up and displayed in my CRM system.
However, If I have some products for which I am able to see the partial delivery in the ECC system, For ex. i am order a qty of 50 of product X, and only 5 are available in stock, do I need to do some extra settings in CRM to be able to see this?
Regards,
Thiru
Hi,
When you create the sales order and go to the "Shipping" tab in the field "DeliveryControl" you have to select "Partial Delivery Allowed".
Regards,
Deepak