cancel
Showing results for 
Search instead for 
Did you mean: 

How execute different node job through Composite job?

Former Member
0 Kudos

Composite Job configure in node 1 and number of jobs configure in this Composite job. All jobs in different nodes like job1 in node 1, job2 in node 2 and so on..

When executing Composite job other node job is not executed. Any one have idea about this. How execute all node job through Composite job? If not possible through Composite job is there any alternate to do this?

Thanks in Advance !!!

tylermac
Product and Topic Expert
Product and Topic Expert
0 Kudos

What version of hybris are you using? Are you using defined cluster nodes or are you using cluster affinity and defining cluster groups?

Former Member
0 Kudos

Hi Tyler, Thanks for your reply. We are working in 5.5 version and cluster environment configured as hybris wiki.

Thanks, looking for solution.

Accepted Solutions (0)

Answers (1)

Answers (1)

tylermac
Product and Topic Expert
Product and Topic Expert
0 Kudos

If you want the cronjob to run on any node in a specific cluster of nodes then your best option is to look at upgrading to 5.5.1 and making use of the cluster improvements (https://wiki.hybris.com/display/release5/Cluster+Improvements+and+ID+Autodiscovery). Once you define the cluster group you can set the jobs that make up the composite job to use that cluster group. You would also need to ensure that the task engine is set to run on those nodes as well (https://wiki.hybris.com/display/release5/task+-+Technical+Guide#task-TechnicalGuide-Changessincevers...