2007 Mar 29 3:56 PM
HI,
I am fetching actual costs break down by period(month) from COEP table based on cost element.But it is taking lot of time to fetch the values. can anybody suggest me from which table i can fetch the values based on cost element.
Thanks & regards
2007 Mar 29 4:03 PM
2007 Mar 29 4:03 PM
2007 Mar 29 4:15 PM
Hi Lianto,
I am getting the actual costs by tacking value type as 04 from cosp.
Thanks.
Regards,
RK