SAP PM- Install equipment during MIGO

0 Kudos

Hello all,

I have a requirement where i have to install a equipment while posting a goods issue in MIGO.

Usually after Goods issue in MIGO equipment status will be AVBL and it can be installed.

But in my case equipment installation should happen automatically during MIGO.

trying to use below exits:

  • A.IQSM0005 Customer exit in update
  • B.IQSM0007 Customer exit for goods movements

But i'm not getting the equipment number to be installed.

Is there a way we can get it?

Also my requirement is to install equipment as a subequipment under some condition.

If it is a sub-equipment, installation should happen with data transfer from the superior equipment.

Is there any BAPI available that will install equipment with data transfer?

Please advise.

Thanks,

Glory.

2 REPLIES 2

NTeunckens
Active Contributor
0 Kudos

Do some testing with the following BAdI's / UserExit :

  • EXIT_SAPLMBMB_001 => Customer Function Exit in the Case of Updating a Material Document
  • MB_DOCUMENT_UPDATE => Business add-in during posting of material document: MSEG and MKPF
  • MB_DOCUMENT_BADI => BAdI: Creation of Material Document


See the following BAPI's :

  • BAPI_EQUI_INSTALL
  • BAPI_EQMT_INSTALLHR (includes defining a Hierarchy)

0 Kudos

Hi,

MY requirement got fulfilled by using the following BAPIs

BAPI_EQMT_INSTALLFL

BAPI_EQMT_INSTALLHR.

But while installing i need to populate start-up date of equipment (ITOB-INBDT)

Any idea on this?

Thanks.