Operation number in PP and QM

former_member182371
Active Contributor
0 Kudos

Hi,

does anyone of you know what´s the relation between these two fieds?:

1.- PP -> AFVC-VORNR = '0010'

2.- QM -> QAPO-INSPOPER = '0001'

there must be a relation somewhere because both mean the same.

Best regards.

1 ACCEPTED SOLUTION

Former Member
0 Kudos

Hi calsadillo,

1. actually both are same,

2. but the MEANING & CONTEXT ARE DIFFERNT

3. in QM,

it is nothing but

a parent of MIC for inspection lot.

4. in PP,

its also nothing, but STEPS,

ie. group consisting of numerouc activities.

regards,

amit m.

3 REPLIES 3

Former Member
0 Kudos

Hi calsadillo,

1. actually both are same,

2. but the MEANING & CONTEXT ARE DIFFERNT

3. in QM,

it is nothing but

a parent of MIC for inspection lot.

4. in PP,

its also nothing, but STEPS,

ie. group consisting of numerouc activities.

regards,

amit m.

former_member182371
Active Contributor
0 Kudos

Hi Amit,

How can i identify that:

AFVC-VORNR = '0010' = QAPO-INSPOPER = '0001'

That is, i have to obtain QM data of a certain PP operation data. I have both in ternal tables (PP & QM) but i´m not able to identify that a PP operation '0010' corresponds to a QM operation '0001'.

How can i do it?.

Best regards.

0 Kudos

Hey guys,

You may be able to link the two if you have for instance the keys that relate the two tables. I'm not familier with PP but I know that in QM we use MATNR (Material Number), WERKS (material Site), PLNNR (Inspection plan Group), and PLNAL (Inspection plan Group counter) and for each combination of those 4 keys, you have one VORNR or operation Key. - Hope this helps you.