Application Development Discussions
Join the discussions or start your own on all things application development, including tools and APIs, programming models, and keeping your skills sharp.
cancel
Showing results for 
Search instead for 
Did you mean: 

IDOC after Material Change

Former Member
0 Kudos

Hi all,

I would like to send a IDOC after a material has changed.

I have to send the complete material by IDOC, so not by the change pointers (TC BD21).

Normally a user would change a material and then would start BD10 to send the material.

I have found a user exit EXIT_SAPLMGMU_001 but a that point the material is not saved.

How can I start BD10 after the material has been saved?

Or does someone know another way to achieve this?

Greetings Fred.

3 REPLIES 3

Former Member
0 Kudos

Hi Frek ,

If u r working ECC after saving the material (Please Check the code) . After this code create an Enhance Spot . where u can call ur transaction .

I hope it resolves ur problem .

Rgds

Sree M

Edited by: Sree Merugu on Apr 21, 2008 5:00 PM

0 Kudos

We have ECC 5.0 so we can not create an enhance point.

I have found a function with which I can create the IDOC, now I need the place to put it.

The database update should have been completed (succesfully) at that point .

I have not found a user-exit or a BADI at the right moment / place jet.

0 Kudos

Hi Fred,

I have the same requirement.

Can you help me to solve the issue.

How to send full material IDOC after create/change of a material.