Hi Experts

Through EKPO extension we are trying to add 3 new fields. Can anyone suggest us what will be the drawbacks and what will happen to the existing data in the system.

1 ACCEPTED SOLUTION

Former Member
0 Kudos

As long as the added fields to the structure OI0_EKPO_EXT  are not key fields , there wont be any impact to it.  Ensure that you do the SE14 Adjustment in background only post addtion

4 REPLIES 4

Former Member
0 Kudos

As long as the added fields to the structure OI0_EKPO_EXT  are not key fields , there wont be any impact to it.  Ensure that you do the SE14 Adjustment in background only post addtion

0 Kudos

What about when transporting the change

Is a table re-org involved and could there be some down time?

0 Kudos

Table re-org is what we do in SE14 , To Adjust and Activate the changes .

1. Ensure that you do not select the "Delete Data" while activating in SE14.

2. Ensure that you do it in the background mode only . 

During Transport ensure that no active background jobs are active which could possibly use this table.

On a safer note , move the transport over the weekend when theres not much activity/scheduled jobs

0 Kudos

A database re-org is different from adjusting the table through SE14. Depending on the change to the structure, adjusting the database may or may not be necessary.

The need for a database re-org would be determined independently.