2007 May 08 3:27 PM
Hi all,
I have a requirement that I need to send 3 different files from SAP to Legacy system.
First file ---> at 1:30 PM & 6:30 PM (Daily twice).
Second file -
> at 2:30 AM (Daily).
Third file -
> at 1:00 Am (Daily).
I need to write a Interface Report program to create these three files and send to Legacy system. So can I create a job according to the mentioned timings above?
(Note : Each file will be using different variant)
I think you understand my problem. Appreciated your early inputs.
Please let me know that you want more explanation......
Thanks
Ranjith.
2007 May 08 3:56 PM
HI Ranjith_T.
If i undestood you right, you want your interface to run twice with one variant (say variant 1), and once with variant 2 and 3.
After creating your interface, there are several options to schedule that.
One very simple would be (in SM37):
- Create a daily job (var1) at 1:30 PM
- Create a daily job (var1) at 6:30 PM
- Create a daily job (var2) at 2:30 AM
- Create a daily job (var3) at 1:00 AM
If that's not it explain a little better the scenario.
You can also use FM JOB_OPEN and FM JOB_CLOSE but in this scenario i dont't think it's necessary.
Hope this helps.
Reward usefull ideias.
Best regards.
Valter Oliveira.
2007 May 08 3:57 PM
HI Ranjith_T.
If i undestood you right, you want your interface to run twice with one variant (say variant 1), and once with variant 2 and 3.
After creating your interface, there are several options to schedule that.
One very simple would be (in SM37):
- Create a daily job (var1) at 1:30 PM
- Create a daily job (var1) at 6:30 PM
- Create a daily job (var2) at 2:30 AM
- Create a daily job (var3) at 1:00 AM
If that's not it explain a little better the scenario.
You can also use FM JOB_OPEN and FM JOB_CLOSE but in this scenario i dont't think it's necessary.
Hope this helps.
Reward usefull ideias.
Best regards.
Valter Oliveira.
2007 May 08 5:07 PM
Hi Valter,
Thanks for your early reply. Do you have any model Interface program which creates files and send to Legacy system ?
Regards,
Ranjith.
2007 May 08 5:17 PM
Hi Ranjith.
How do you want to send the files to that Legacy system?
Best regards.
Valter Oliveira.
2007 May 09 6:31 AM
Hi Ranjith,
Include a field on the selection screen for the name of the File that you want to send.
Create 4 Variants (One for Each File Type & Time Combination)
Var1A & Var1B - First File
Var2 - Second File
Var3 - Third File
Use Transaction SM36 to create 4 Background Jobs:
Provide the following
Job Name : Z_JOB_1
Job class : (Priority - As per your choice)
Goto Define Steps (Function Key F6)
Provide the following
Name : (Name of Program)
Variant : Var1 (For 1st File)
Language : EN (or whatever)
Specify Start Condition: (Function Key F5)
1. Press Date/Time Pushbutton
2. Specify Schedule Start date (Todays Date) - Dont specify end date so it will execute everyday
3. Give the Time that u want to start the processing (1:30 PM as 13:30:00 for 1st variant)
4. At the botton left hand corner of the screen you will find a checkbox for Periodic Job - Select that & Press Function Key F5
5. Select Periodic Value as Daily & Save
6. Save the Job
Create the other 3 jobs similarly with the required variant & Time.
This should hopefully solve your problem !!
Kindly be generous with points if you find the solution useful....
Regards,
Gaurav Parashar
2007 Jun 07 5:17 AM
Hey,
Is this ranjith tavidisetty.... if yes please call me on 09974440499...
need to speak to you.....
regards,
naveen.