former_member828141
Explorer
Member since ‎2022 Oct 16

User Statistics

  • 35 Posts
  • 0 Solutions
  • 0 Kudos given
  • 1 Kudos received

User Activity

I have requirement that i need one more option reference date for vendor confirmation monitoring period. Here 10 monitor is given which minus the ten days from monitoring date I am want to reduce to 5 days so I don't have option 3 in the syste...
BOM with line item category "R" to add variable size. I have extended the message type LOIPRO --- LOIPRO04 to ZLOIPRO4 When I create production order then ZLOIPRO04 is not filling . I know that it is the old thread but still want to get clarif...
How to use BAdI: Determination of Logical System from Order Data with BADI option I see there are three options 1) cUSTOMIZING 2) badi 3) drf I am going to do with BADI option. Can anyone has complete steps how to user BADI
I am new to Idoc, I have created LOIPRO04 extension ZLOIPRO4, and created segments in WE31, but how to fill during Production order, If anyone can give me details steps, it would be appriciable. We have production order which top material and Th...
I have configured Logical system, LOIPRO Idoc and check connectivity in SM59, when I tried to create Production order the idoc is not creating and its leaving error that production order is not relavant to MES. What could be solution if anyone help...
Kudos from