Hello,
Can we have different campaign number ranges for 2 different business process in sap pp.
For example, I created 2 campaign number ranges in snro with object PCAMPAIGN but not sure how to assign these 2 campaign number ranges in 2 sets of p...
Hello,
Our pooled capacity resource in APO got deleted while updating the calender changes and hence it is deleted from active version. (showing in model independent versions)
Later we tried to send the linked resources in pooled capacity through...
Hello,
While converting planned order to process order from APO by flagging conversion indicator, the planned order is getting stuck in ECC queue with following error
'Standard prod. production w/o batch mgmt reqmt poss. only in indiv. stock".
...
Hello,
We are using MRP heuristic having product heuristic SAP_PP_002 and noticed that unfirmed planned orders are not getting re-exploded during production planning run.
But the same orders are getting re-exploded during manual planning using re...
Hello,
What are the differences in PDS transfer if we have the following settings:
1) Transfer Deletion Flag only
2) Change Transfer only
3) If both Transfer Deletion Flag and Change Transfer are active.
How to send only the changes to APO ...
Hello Brahmakar,It is a configurable material and below is the error details."Standard prod. production w/o batch mgmt reqmt poss. only in indiv. stock"Message no. MILL_CONF_IN_PROD010Thanks,Prasanth
Hello Alan,Earlier I checked that note, but not sure whether it relates to our issue.As far as I understand from the note , the error occurs when we change the planned order in APO (mostly scheduling) and hence it is not in sync with ECC. So when we ...
Hello Brahmankar,Thanks for the details.The issue we are facing is whenever we change the recipe with new components, the same is successfully getting transferred to APO PDS, but re-explosion is not happening.We have maintained planning file entry in...