former_member682136
Explorer
Member since ‎2007 Jun 26

User Statistics

  • 32 Posts
  • 1 Solutions
  • 0 Kudos given
  • 1 Kudos received

User Activity

After service pack upgrade in our SCM 5.0 system. We are facing problem while loading data in planning book. When we select products and MRP combinations in selection id for DP planning book. Popup appears as there are no plannable characteristic com...
While running consistency check for planning area, I am getting error as 'Superfluous relationships'. while going back from it shows 'COM routine error (return code 2). When I repair, it gets repaired but after some time superfluous relationships aga...
Hi,When I am doing cost/mark/relaese for a material. The planned price in the mat master is being updated. But, the std price remains the same. Please help.Regards,Umesh
I have labor rate as $0.24/minute, when my labour time is 45 seconds, labor cost in the work center formula comes correct at $0.18. While in CK11n during costing the kit, the system shows labor cost $0.24 for 45 seconds. when the time is less than 30...
Hi All,I have labor rate as $0.24/minute, when my labour time is 45 seconds, labor cost in the work center formula comes correct at $0.18. While in CK11n during costing the kit, the system shows labor cost $0.24 for 45 seconds. when the time is less ...
Kudos from