Hello Experts,
I have an requirement form client that for alternate material maintain in BOM system should check stock availability of all materials as per priority when MRP run is carried out. So basically if 3 materials are alternate for each oth...
Hello Experts,
Can we exclude some storage location stock when system carries out material availability check at the time of production order release and restrict the production order release when sufficient stock is not available?
I know we can...
Hello All,
Our client required standard report for operation details of rate routing
I have checked several threads but do not found any solution.
Kindly suggest is there any standard report available for this requirement.
BR,
Kunal Sakpal
Hello,
When we run CK40N with one FG material at selection step system select only one FG material and cost only that material but SFG materials not considered in spite of selecting Explode multilevel structure option in selection step.
We are us...
Hello,
We are facing issue with one of the production order.
Production order is fully delivered and also got settle (balance is zero)
But when we run the report FAGLL03, we do not found any debited entry against this production order.
Only o...
Hello Caetano,Thanks a lot for your response.Every time i prefer to go with standard functionality as suggested by SAP and actually its help a lot to business as well rather than going for any custom solution.Actually i have gone through above link ...
Hello annehustis
Really appropriate your efforts for this great blog.
Very Good blog which explains about importance of each status of production order and its position at each actual production Process.
However, I would like to highlight on Close...
Hello Anthony,Thanks for reply.I checked in OP77 and not able to change usage area, I think its default as P-routings for productionCan we change the same?BR,Kunal
Hello,Thanks for reply.I have checked CA85 but its not work as we need to put workcenter which is need to be replace but as i have mention earlier client wants report for operation details for rate routing by just entering plant at selection screen s...
Hello,Thanks for your reply.I have checked CA51 but the output of the same is not available in ALV format and client wants report in ALV format only.I have also checked and suggested tcode-CA85N for routing but for rate routing there is no option to ...