Hi All,
As on today , we have one GTS common system connected to multiple ECC system ( xx1 (GTS)) to xp1,xp2,xp3 (ECC Systems). As one of the division going out from existing set up, we are separating GTS system of division and moving into new GT...
We have two feeder system connected to common GTS system and we want to use two different legal regulation for each logical system. Is it possible by configuration or enhancement?
Hi, I have issue where even after listing the article thru Tcode WSP4 and after that having a valid MARC and WLK1 entry, Sales order is throwing error as Article xxx does not exist in site xxxx. Can someone tell me where is the error and posiible sol...
Hi Kaushik, Thanks for quick response.Currently we have a separate box for GTS and connected to multiple ECC systems. And my client planning to migrate from ECC to S4 in next few months, hence we are doing pre study for the future system. Since GTS ...