Dear All,
Am having a time profile which is on +15 days to +365 Days.
in RRP3 we could see the process orders should be created outside the PPDS plng time fence.
For eg : i have the Order on 28.11.2020 and the end of planning fence is +15 days ...
Hi Experts,
We have an issue in CPIDS and S/4 HANA Integeration,unable to fill extractor /IBP/ORDER_KF in S/4 HANA.
But its prerequiste table fields are filled.Hence sales order data is not flowing to IBP from S/4 HANA
let me know if you have f...
Hi All,
We have to Delete the Resource of 1500 which was wrongly in S/4 HANA in APO.
What is the best way to Delete them one short.
Regards,
Ravikiran
+91-8861233666
Hi All,I have 3 manufacturing plants where in the sales orders are available in the sales office and we need to distribute the sales orders to different manufacturing plants based on the capacity.we have a requirement where the system should automati...
This Theory might help.● The disaggregated key figure values at the base planning level are always rounded to the configured
number of decimal places.
Rounding is done in the planning unit of measure. If the planning unit of measure is different from...
Hi Josef,check if you can change the decimal places in Display settings. The Default setting is 6 decimal places. Refer model configuration guide.Regards,Ravi
Hi Abhijeet,Please check the Transportation costs maintained for the Plants and DC's because Quota will not be considered and it mainly focus on cost parameters check whether the system is trying to find the cheapest Tlane and does supply for that lo...
if there is any connection between S/4 HANA and IBP then can you check by running /SAPAPO/CCR and check the orders got stuck in the queue once. so that the system will be in sink.