Atul_Joshi
Explorer
Member since ‎2006 Jun 19

User Statistics

  • 30 Posts
  • 1 Solutions
  • 17 Kudos given
  • 0 Kudos received

User Activity

Hello,for the vendor return process in EWM, we need to cancel the inspection lot before return to vendor is initiated from MIGO with reference to GR material document.Is there any way to cancel the inspection lot through config or enhancement, so tha...
Hello All,We have a below Scenario:A Storage type with multiple Aisles. Out of 5, 4 has partial picking whereas 1 aisle need to have full pallet picking due to space constraints.is there any way we can always perform the full pallet picking from bins...
Hi All, We have scenario where each bin has capacity of 13 HUs. Can someone please share how this can be achieved in EWM. is the only way to use capacity points or do we some more options to achieve it. Thanks in Advance. Regards, Atul
Hi Team, For all the Bin-Specific Physical Inventory procedures while counting on RF we get the "F3 HU Cmp" i.e. HU complete button. but this does not appear for the Product-Specific Physical Inventory document in RF. Is there anyway we can act...
Hi All, I have question regarding the POSC in the replenishment process. As an requirement we need to map the replenishment using the POSC as repacking needs to be performed as an intermediate steps. the storage process gets triggered with repl...