former_member600850
Explorer
Member since ‎2019 Jan 17

User Statistics

  • 6 Posts
  • 0 Solutions
  • 0 Kudos given
  • 4 Kudos received

User Activity

Hello Guru's, I have 3 requirements in QM which are interlinked to each other. Requirement 1- Inspection should be done based on Vendor lot not SAP batch number.1 vendor batch may have multiple SAP batches. Material Vendor batch SAP Batch Insp...
Requirement is Supplier sends Pre- shipment 2 weeks before the delivery date. Example : PO will have 2 line items. Line item 10 - 800 pc and Line item 20 - 4 pc. Vendor will ship 4 pc 2 weeks in advance. Quality team will test the 4 pc. If 4 pc ar...
Dear Experts, Requirement- Inspection Lot will be created in SAP ECC without inspection plan. This inspection lot information should be transferred to other NON SAP System. Non SAP system sends the UD. When SAP receives the Usage decision from Non...
Recurring inspection Requirement is - Quality team wants inspection lots to be created after the SLED date is reached. Means first inspection date in the Batch hear master should be equal to SLED date. After the first inspection they want to...