former_member591271
Explorer
Member since ‎2016 May 10

User Statistics

  • 31 Posts
  • 0 Solutions
  • 1 Kudos given
  • 1 Kudos received

User Activity

Hi all, For FERT material in material master MM02 i have maintained the Planning strategy group as 10(MTS) in MRP3 view.But when im entering the demand in MD61 - it is showing the error as (Requirements type VSE does not exist) IN CONFIGURATIO...
Hi all, In a process order i'm having a raw materials & Bi-Product with a negative quantity. But when i take the print. I'm not able to get the Bi-Product with is in negative quantity. Thanks and regards M.Praveen
Hi All, My Scenario: I have created a raw material(Methanol) with availability check "02" in material master(MM02).And i have assigned that raw material in BOM . I have not maintained stock for raw material. Now When i'm creating a process order ...
Hi All, PRODUCTION SCENARIO: In COR1 i'm creating a process order.When i release the process order, system is generating an automatic reservation number. So based on this reservation number store people should transfer the materials to my storage l...
HI All, In BOM: I have Maintained a byproduct of quantity 100- L In master recipe: I have assigned the byproduct for RE-101 phase(0020) I have created the process order & released. when I'm confirming the by-product 100 L an inspection lot is ...
Kudos from
Kudos given to