Hi All,
I am facing an issue in OPSK tcode, the following screen is coming up.
I have already shared the su53 screen to basis team, but as per them there is no technical authorisartion issue as such.
I checked that snote 375945 ...
Hi Experts,One issue I am facing is that AUTOMATICALLY AVAC STATUS is not populated upon cj32.I have to do manually by Extras--> AVailability control --> Activateor by CJBN.IN OPS9i have treid refreshing the database by CJEN as told in existing threa...
Hi Experts,I am working on a project, and Have to Prepare KDS (Key data structure) document.As I am aware that PS does not have organisation structure, It derives the same from MM, FICO and other mouldes.Still I want to know what Should I put in SAP ...
Hi Experts,I am trying to use the functionality of Simulation project to create different scenario for quotations. Here only the basic cost is reflected in the cost analyisis thru SAP project system. The need is to include the Taxes in the simulati...
Hi Experts,I am doing network costing, and rolling up to WBS through Project simulation, and finally converting it into Operative project.Now the issue is that suppose wbs1 - cost plan value = 500,when i am trying to allocate budget , in cj30, t...
Hi Experts,Found the answer. We have to implement SAP Notes Check these notes provided by SAP for the same to my friend 228706 , 2257155 , 2263077.Got the solution in another existing thread.. AVAC not being activated in S/4 HANA | SCNClosing the th...
Hi Maria,Just for testing I made the changes in ops9 , I tried with only at overall and activation type 1.AVAC is happening automatically in this scenario.But When I ticked overall and Release, with activation at 1, again after release of Budget, AVA...