former_member475608
Participant
Member since ‎2016 Jul 05

User Statistics

  • 98 Posts
  • 1 Solutions
  • 6 Kudos given
  • 1 Kudos received

User Activity

Dear Experts, In capacity leveling screen CM21 I can see my order's operation and phases adhering to the relationships in the un-dispatched, lower section. But when I dispatch my complete order they do not adhere to the relationships maintained in ...
Dear Experts, I have gone through many threads regarding this problem on SCN and have done relevant setting in OPPQ, OPU5, OPUZ(PP-PI) and Material master but all in vain. I'm attaching screen shots of all these screens with addition of MRP results...
Dear GurusI've done relatively all the settings regarding MRP and scheduling. Now when I put a single value 10,000 in MD61 for a month, system breaks the quantity in 20 planned order of 500 because I've set the batch size as fixed at 500 quantity. Bu...
Dear Experts, My Client produces SFG and FG. SFG batch number is assigned by the system. My client wants the same SFG batch number to be carry forward by the system as the FG batch number - ae0005 (SFG batch no.) -- ae0005 (FG batch no.).As per my ...
Dear Experts,My client changes factory timings as and when needed. Its cannot be predicted and the decision is taken a few moments before the factory is supposed to shutdown.Right now they have only one shift which starts at 8am and ends at 6pm. When...
Kudos from
Kudos given to