Hello,How can I use different movement types in logistic documents for meter readings?I set up additional meter event for own consumption and I need to get logistic document with other movement type (as standard we running creating logistic document ...
Hello colleagues,I need to link the records of meter reading and the payment card transaction record in OIRADBT table.How can I solve this issue?Thanks in advance!KR,Sergey
Hello experts!I need to fill field CHARG in the logistics document for meter readings.The field CHARG added to the schema (IMSEG-CHARG) and I use BADI to fill document before aggregation.In proccess I defined value CHARG for Plant/SLoc (from OIRADBT)...
This checks not provided in the system.Try to create customer-specific routine for capacity checks in the method IF_EX_OII_TANK_MM_HANDLING~ADDITIONAL_MM_CHECKS.IMG>Industry Solution Oil & Gas (Downstream)>HPM (Hydrocarbon Product Management)>Silo/Ta...
The main cause of the issue is a wrong data in assignments of materails.Once again, all unrestricted assignments to the one tank must have the same parameters.You could assign material with different parameters only if all previously assigning are re...
Hi Amol,I see very strange situation on your screen. There are two assignments with different parameters on the same date and as result the system check it and create error.Do i understand correctly you have one open assignment only, but this assignm...
You must check all entries for your tank in the table OIISOCTSM, not the material in different tanks (SOC segment no. 00000000000000000043).If there are all entries with the same parameters try to check parameters in those material that have assigne...
If I'm understanding correctrly, you have got the same error OC805 when try to fill the end date?Please provide the screenshots with error and data from table OIISOCTSM for this SOC.KR,Sergey