cancel
Showing results for 
Search instead for 
Did you mean: 

Why I can't connect to my BW on HANA system in HANA Studio?

Martin_Xie
Product and Topic Expert
Product and Topic Expert
0 Kudos
2,053

Hello,


    I am using BWMT to do exercise, I have 8 connections in SAP Logon, when I want to connect to the system "BW on HANA", I found I even can't see it in HANA studio connection selection list, please refer to the attachments for details.

    Is there any one who can help me?


B.R

Martin Xie

Accepted Solutions (1)

Accepted Solutions (1)

Martin_Xie
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hi, folks:

    After one day research, I found the HANA Studio seems to read connection information from NWBC, not from the SAP Logon, so after I delete NWBC from my computer, every thing seems back to the right situation, thank you all.

B.R

Martin Xie

Answers (3)

Answers (3)

former_member195433
Participant
0 Kudos

Hi

I get the following message

Do we need any specific roles on BW application to be able to login via BW modeling tools in eclipse.

user  is not authorized to access system BWD via ABAP in Eclipse (No authorization to access the resource  /sap/bc/adt/compatibility/graph.)

Bruhn
Explorer
0 Kudos

Hi Martin,

It seems as if you are trying to create a BW project which would use the sapgui connection strings. But you are asking about the HANA system for that you will need to make sure that you have the host of the hanadb server and the instance number (if you have access to the DBAcockpit transaction on the BW you can find the hana host by navigating to the configurations folder and select the services) this will reveal both the hana hostname and the SQL port on the indexserver 3xx15 where xx is the instance number you will need)

From hanastudio start by opening the SAP HANA Administration Console perspective (window-open perspective). From this perspective you can add a system (small server like icon with a green plus marker). If you are connecting to a hana system(as opposed to the hana cloud system) you choose the Add System and the screens will guide you thru (as said you will need hostname, instance and user credentials). Check out this one also

Hope this helps.

/MiB

Martin_Xie
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hello, Mib:

    Thanks for your quick reply.

    I'm not logon to HANA system,but using BWMT to logon BW system which based on HANA. At the very first step I have to add a BW system using BWMT and I can't find my existing system in SAP logon file, it seems the HANA studio store the information several months ago and didn't update that anymore.

B.R

Martin Xie

Bruhn
Explorer
0 Kudos

Sorry about that - so under the BW modelling perspective in Eclipse/hana studio when you create a new BW project you should get a popup which will display either the sapgui entries(use the browse button) or you can select "define manually". Have you tried to define manually and enter the connection properties ?

/MiB

Martin_Xie
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hello,Mib:

    Yes I try to input connection parameter manually, but unfortunately no where to input as BW project, while creating ABAP project, I can input manually.

B.R

Martin Xie

Bruhn
Explorer
0 Kudos

Strange - have you updated the hana studio - my update is not more that 1 week old it could be that yours is not entirely up to date?

You can update from the help-check for updates menu path.

/MiB

Prabhith
Active Contributor
0 Kudos

Hello ,

We don't have the 'Define manually' option for a new BW project.

We will have to connect it to the one available in the SAP Logon.

Your issue seems to be very strange.

Could you please let me which Eclipse(Kepler/Juno) version you have used.

Or which version of HANA studio you are using.

BR

Prabhith

Prabhith
Active Contributor
0 Kudos

Hello ,

Little crazy to ask you this question:

Can you press CTRL Space in the connection area and see if the BW on HANA system is seen:

BR

Prabhith

Martin_Xie
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hello:

    I'm using HANA Studio version 1.00.85.0 , I think it's really strange, my colleagues install the same version, but they can see the connection change according to the SAP Logon.

B.R

Martin Xie

Martin_Xie
Product and Topic Expert
Product and Topic Expert
0 Kudos

When you choose CTRL+SPACE, your input tool will be changed, hehe.

Former Member
0 Kudos

Hi Martin,

To Logon to the BW on HANA, you need to logon to SAP HANA studio and there you can see the SAP logon where the HANA is installed. You can logon to the respective system.

Thanks and Regards,

Mahesh

Martin_Xie
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hello, Mahesh:

    Thanks for your quick reply.

    Actually in the very first step I have to add a BW system using BWMT and I can't find my existing system in SAP logon file, it seems the HANA studio store the information several months ago and didn't update that anymore.

B.R

Martin Xie