I have a universe that I maintain in the IDT. Due to different authorizations, I need the universe twice with different connections.
I have now created these and received CUID xy and vw. Now the first major changes are due. How can I prevent having to make the adjustments twice?
Problem: If I make the adjustments to the universe with the CUID xy, then copy it and adjust the connection, I don't automatically have the CUID vw again. The dirty way would be to simply change the CUID of the second universe in the CMS database back to vw.
Isn't there a more elegant way? Updating the existing universes individually each time is too much work for me. Many thanks for the ideas!
Request clarification before answering.
I didn't know about this option. Do you have links to the relevant part of the manual?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 14 | |
| 8 | |
| 6 | |
| 6 | |
| 3 | |
| 3 | |
| 2 | |
| 2 | |
| 2 | |
| 2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.