on 2024 Dec 27 1:18 PM
Hi Experts,
I have downloaded a note in development system and implemented it with transport request creation.
Now before moving the transport request into quality and production systems ..
1) Should I have to download the note in Quality and production systems from SNOTE manually and keep it ready?
2) will that transport request import fail If I dont keep the SNOTE downloaded in advance.
Note : Quality and Production system dont allow the notes download.
Please answer.
Thanks in advance
Request clarification before answering.
just go ahead to move the tr, nothing else.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 14 | |
| 8 | |
| 6 | |
| 6 | |
| 3 | |
| 3 | |
| 2 | |
| 2 | |
| 2 | |
| 2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.