cancel
Showing results for 
Search instead for 
Did you mean: 
Read only

SAP to P6 - NetWeaver Upgrade to SP27 Not Working and SP11 Working

santosh_k3
Active Participant
0 Kudos
406

Hi Team

Here is our scenario , we have already upgraded SAP EPC component to 3.2 version in SAP PO/NetWeaver SP11 , both directions the data flow was flowing using SAP EPC Primavera API Adaptor.

SAP R/3<-> SAP NetWeaver SP11 <--> Oracle - Primavera P6 (19.20 version).

But when we upgraded to SAP PO/NetWeaver SP27 , we see an issue .

Integration between SAP R/3 and P6 is only working one-way : SAP to P6 is not working , where as P6 to SAP working.

We really don't understand want went wrong?

As per the PAM , we see the SAP PO/NetWeaver SP12 Onwards , EPC connector is supported.

https://support.sap.com/content/dam/launchpad/en_us/pam/pam-essentials/EPC30_PAM.pdf

we wen through couple of notes , but nothing helped us , Connections are showing success , no errors in the NWA logs

2486928 - SAP EPC Primavera P6 EPPM configuration using Primavera P6 EPPM Integration API: setup/settings/troubleshooting - SAP for Me

2297855 - SAP EPC Primavera P6 EPPM Integration: setup/settings/troubleshooting - SAP for Me

Please let us know , what are we missing or done wrong here?

Thanks

Sai

Accepted Solutions (0)

Answers (0)