cancel
Showing results for 
Search instead for 
Did you mean: 

SAP ME NC Routing: return next + complete original operation for ERP Confirmation

martinobermayr
Explorer
159

Dear SAP Community, 

we want to achive the following:

  • NC + Disposition is sending an SFC from production routing to NC routing
  • after processing the NC Routing with Rework the SFC should be processed at the next operation of the production routing. Therefore the "Return (Next)" routing step is assigned at the end of the NC routing
  • the original operation must be confirmed in order to have a  successful confirmation into the ERP system

How can this be accomplished?

Thanks

Accepted Solutions (0)

Answers (0)