Dear SAP Community,
we want to achive the following:
- NC + Disposition is sending an SFC from production routing to NC routing
- after processing the NC Routing with Rework the SFC should be processed at the next operation of the production routing. Therefore the "Return (Next)" routing step is assigned at the end of the NC routing
- the original operation must be confirmed in order to have a successful confirmation into the ERP system
How can this be accomplished?
Thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.