Replication Profit and cost centre with different Controlling area then MDG Hub

ps_kanwar
Associate
Associate
0 Likes
386

hello Team,


We have more then 3000 Profit center(PC) and 30K cost center(CC) exist in the MDG system.which needs to be replicate to a New SAP system . But the new SAP system has the Controlling area(CON1) is different then the MDG Controlling Area(CON2).

While replicate PC and CC can replicate with concatenation of Controling area . So we have decided to use the Key mapping for PC and CC .

Now here we have two scenarios:

1. Initial upload for this we can maintain key mapping for all PCs and CCs and upload it through a report as mass maintenance is not exist in MDG (Note : 3110228 ). This is also okay and agreed .
2. In case a new PC and CC will create, user has to manually key in the key mapping in MDG_KM_MAINTAIN.

The 2nd point process can we automate by writing a logic to create the key mapping for a particular system in Replication out BADI ? Do you have any suggestion of any BADI exist for it in MDG-F?

I came across the BADI: SSC_MDG_PC_RPLCTN And SSC_MDG_CC_RPLCTN
Will it be correct place to write a logic for Key mapping ?

Regards,
Partha