cancel
Showing results for 
Search instead for 
Did you mean: 
Read only

Process Orchestration SCA - DC

Former Member
0 Likes
277

Hi everybody, I´m working in a PO environment, I´m not a BASIS guy and I want to be sure that I will not have problems with the Development Configuration after the initial phase, so, I need your help if you can check how I see the development configuration from NWDS and if you have some details about this, and maybe if you can share some link about the SCA that are needed in the PO (PI+BRM+BPM) environment will be great too.

The SCA´s that I found are :

ESCONF_BUILDT

ESMP_BUILDT

FP-INFRA

FRAMEWORK

MOIN_BUILDT

SAP_BUILDT

SERVICE-COMP

WD-RUNTIME

COMP_BUILDT

BPEM-BUILDT

BPEM-CONTENT

BPEM-COLLAB

BPEM-FACADE

CU-BASE-JAVA

CU-BASE-WD

DATA-MAPPING

ECM-CORE

ENGFACADE

but I dont´t see all the types of projects available from NWDS, any hint will be appreciated. Thanks !

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Likes

The basis team found this note 1457908, I think that the bold ones are the only required for a PO environment isn´t !?

    • Business Process Management (BPM)
    • Business Rules Management (BRM)
    • Composite Application Framework (CAF)
    • Data Mapping
    • Guided Procedures (GP)
    • Java EE
    • Service Composition
    • Visual Composer (VC)
    • Web Dynpro
    • Enterprise Portal (EP)
    • Web Services
Jocelyn_Dart
Product and Topic Expert
Product and Topic Expert
0 Likes

Yes but it's handy to include CAF - there's always the odd composite development that you might want to do to fill a gap, the composite designer is a handy overview of related BPM/BPM/VC projects, and its easier to load it at the beginning. So I'd include CAF in the list.

Answers (0)