cancel
Showing results for 
Search instead for 
Did you mean: 

Is there a possibility to run RSRV fix in background?

Former Member
0 Kudos
785

Hello,

Is there a possibility to schedule/run the "error correction" part of the RSRV result as a background job and not dialog.

Thank you

Accepted Solutions (1)

Accepted Solutions (1)

former_member188080
Active Contributor
0 Kudos

Hi,

RSRV repair tasks normally happens in the foreground.

because system will ask you what changes it is doing and whether you would like to allow it or not?I am not sure whether once repair done you can take it back when it will happen through this transaction.

aLSO check prgram RSRV_START.

Thanks and regards

Kiran

Answers (1)

Answers (1)

former_member21257
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hi Blue005,

there is no standard report provided as standard to do the 'Repair' tasks within a BGD job.

The reason for this is that some repairs have to be executed in a certain order or a certain time (when no other jobs can interfere). Furthermore these repairs should be supervised by an administrator.

The system is not supposed to do this automatically.

So you'd have to create your own Z-report making use of report RSRV_JOB_RUNNER (which are the actual RSRV tests) or the function module RSDRD_DIM_REMOVE_UNUSED.

Rgds,

Colum