on 2024 Jul 03 9:43 PM
Is it possible to report CBTA test results at the configuration test case/script level with the individual configuration scripts being included in the Composite scripts? I'm executing a Test Plan/Test Package automatically/immediately.
For example, say I have Composite script "ZCOMP_SAP_OTC_Create, change and display sales order" and the Test Script Steps include 1. VA01 - Create Sales Order, 2. VA02 Change Sales Order and 3. VA03 Display Sales Order. When I execute all my scripts within a Test Plan/Test Package currently the test status reporting is from the composite level only. So, if only the VA03 fails, then the test result that is report is an overall failure for the composite script. In CBTA, is there a way to display results (pass/fail) for each of the test script steps with the composite script (in this example VA01, VA02 and VA03) instead of only reporting from the composite script level?
I've checked configurable reports, logs, Test Package Status tab, but I don't see a way... Below is the Status tab of a Test Package that displays the composition scripts failed (no individual test case status), and this is how all the reporting seems to behave.
Request clarification before answering.
| User | Count |
|---|---|
| 8 | |
| 7 | |
| 6 | |
| 5 | |
| 4 | |
| 4 | |
| 4 | |
| 3 | |
| 3 | |
| 3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.