Integration of change documents in M2S in Siganvio

niels1515
Participant
0 Kudos
536

Hello experts,

I was just wondering whether there is also a transformation script for the M2S process in Signavio in which the change documents are considered. In the O2C or P2P Processes they are considered.
As far as I have understood correctly, the changes for production in the SAP system are not necessarily written and you might have to activate something so that you can track this. Or are there other ways of integrating production unit changes into Signavio?

Greetings Niels

View Entire Topic
Taleh_Khalili
Product and Topic Expert
Product and Topic Expert

Hi Niels,

Thanks for your question!

I am sharing the answer my colleague Constantin provided as a reply to your question:

"It is true that the M2S template is not considering change documents, for the exact reason you already provided (Change log via CDHDR/CDPOS is usually not activated per default, see also SAP Note 390635).

However, in case specific changes are logged in the respective system, integrating CDHDR/CDPOS is possible in the same fashion as for example in the OTC template.
I am not aware of any other logs for production unit changes that could be used in Signavio."

Kind regards,
Taleh