I need to prepare a gap analysis document. There is an existing BW system running and for implementation of BPC we need some fields which are not available in BW. BW is implemented on SD,MM .
In BPC we need sales planning, logistics planning, opex planning , capex planning , FM- BCS , COGS/COGM reports.
Please suggest me any idea how to proceed.
Hi
the correct way would be to find your own solution as rightly said by Vadim for which you may want to analyze
You may refer to the link below and see if its helpful ?
http://help.sap.com/saap/sap_bp/BPC_NetWeaver/BPC_DE/HTML/bpc_EN_DE.htm
Regards
Vinita
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
First - incorrect primary tag, has to be SAP BusinessObjects Planning and Consolidation, version for SAP NetWeaver
Second:
"In BPC we need sales planning, logistics planning, opex planning , capex planning , FM- BCS , COGS/COGM reports" - there is nothing standard in this requirements. You have to analyze each requirement in details and then check for the information required from BW!
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
67 | |
8 | |
8 | |
6 | |
6 | |
6 | |
6 | |
5 | |
5 | |
5 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.