cancel
Showing results for 
Search instead for 
Did you mean: 

how to increase No. of calculation jobs for a particular table in SLT replication

0 Kudos
2,091

Hello All,

We have started replication for ACDOCA table using SLT. As ACDOCA has around 2.7 Billion records in source system we have used ranges (divided into 5 ranges based on one of the Key fields) to complete the calculation faster. No. of jobs defined in SLT configuration as below:-

No. of data transfer jobs. 22

No. of initial load jobs. 20

No. of calculation jobs. 10

Once we start the replications there 3 calculations triggered in source system. As each range has around 500 to 600 million records calculation jobs are taking time.

Is there any way we can run 5 calculation jobs in parallel in the source system?

Note:- We have enough resources (background, dialog work processes) available in the source & SLT systems.

Regards,

Vinay

View Entire Topic
0 Kudos

Hi Sunil,

If we change no. of parallel jobs under 'Data transfer monitor' that will reflect only for initial load jobs not for calculation jobs. I have tested this.

Regards,

Vinay