on 2021 Jan 23 8:33 AM
Hello All,
We have started replication for ACDOCA table using SLT. As ACDOCA has around 2.7 Billion records in source system we have used ranges (divided into 5 ranges based on one of the Key fields) to complete the calculation faster. No. of jobs defined in SLT configuration as below:-
No. of data transfer jobs. 22
No. of initial load jobs. 20
No. of calculation jobs. 10
Once we start the replications there 3 calculations triggered in source system. As each range has around 500 to 600 million records calculation jobs are taking time.
Is there any way we can run 5 calculation jobs in parallel in the source system?
Note:- We have enough resources (background, dialog work processes) available in the source & SLT systems.
Regards,
Vinay
Request clarification before answering.
Hi Vinay,
For parallel jobs during Initial load, please do the following:
Go in 'Data transfer Monitor'
Select table and edit and specify no of parallel jobs and save.
Regards
Sunil
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 14 | |
| 8 | |
| 6 | |
| 6 | |
| 3 | |
| 3 | |
| 2 | |
| 2 | |
| 2 | |
| 2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.