cancel
Showing results for 
Search instead for 
Did you mean: 

How to check scheduled ABAP jobs with SolMan 7.2 configuration validation

thomas_tger
Explorer
0 Kudos
362

Hi SolMan Experts,

how can we check for scheduled ABAP jobs (SM37) using configuration validation (or any other tool)?

Details: We want to make sure that on selected target systems a custom job is scheduled and in status "released" with a given step list (ABAP Report & variant). If the job is not scheduled or has not been executed within a given time limit (current time - max time stamp last job run) we'd like to get an alert / report.

Standard Job management seems to be not suitable: It's alerting targets on broken / failed jobs. If I job is not running at all it won't be recognized.

Any suggestions?

Thanks a lot best regards

Thomas Täger

Accepted Solutions (0)

Answers (0)