cancel
Showing results for 
Search instead for 
Did you mean: 
Read only

How can I revert or check what has been done in the Q system before moving TR from Dev to Quality?

ML9797
Newcomer
0 Likes
163

What happened:
Meanwhile having opened task in Dev system I accidentally opened Quality and did very very important change which resulted in desired behaviour of a program, then I have released the task, transport was moved to Quality and my adjustments of course were gone - I've tried various settings to achieve what I did in Q before but it's impossible, it was difficult customisation to do and I was about to check it, test etc. Is there any possibility to check the Q system (it's about the planning profile setup) before the TR movement from D? I think even reverting this TR (if possible) would not help cause it will revert to the previous state after past TR movement, not the slight change which I have done in Q directly and this slight change which was crucial is gone.

Accepted Solutions (0)

Answers (0)