What happened:
Meanwhile having opened task in Dev system I accidentally opened Quality and did very very important change which resulted in desired behaviour of a program, then I have released the task, transport was moved to Quality and my adjustments of course were gone - I've tried various settings to achieve what I did in Q before but it's impossible, it was difficult customisation to do and I was about to check it, test etc. Is there any possibility to check the Q system (it's about the planning profile setup) before the TR movement from D? I think even reverting this TR (if possible) would not help cause it will revert to the previous state after past TR movement, not the slight change which I have done in Q directly and this slight change which was crucial is gone.
Request clarification before answering.
| User | Count |
|---|---|
| 11 | |
| 6 | |
| 6 | |
| 4 | |
| 3 | |
| 3 | |
| 3 | |
| 3 | |
| 2 | |
| 2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.