We need to validate input at cost center level by controlling legal entity and profit center with a validation based in cost center and in parallel to validate input at wbs level by controlling legal entity and profit center with a validation based on wbs. Let’s say: respecting classi sap data model. The problem is that sac do not accept two rules to validate legal entity and profit center . How can sac support opex planning avoiding user to input wrong combinations? Create dedicated separated models is not one Solution because we need total opex in one single place.
thanks
stefano