I am initiating replication from DB2 to HANA using DB connections.
When I added table for replication it went into Scheduled status and stuck there.
I have enough WPs on LTRS side...Is there anything that I should check on DB2 side???
Where I can look for clue why table is stuck in scheduled status?
Regards
Request clarification before answering.
Hi,
Have you made sure that the RFC user in your source system has the correct role assigned for replication? Having said that, I assume that your source system has all the required prerequisites installed?
Cheers
Kris