on 2024 Oct 31 5:15 PM
SAP.
We need to connect POWERBI to S/4HANA PCE.
Previously, this connection is made via ODBC, in Rise, how can we configure this connection?
Do we need to hire an agent for this connection?
The configuration must be done for the collection to happen directly in the Database.
We are not configuring via ABAP CDS.
Request clarification before answering.
User | Count |
---|---|
41 | |
15 | |
10 | |
9 | |
6 | |
5 | |
5 | |
4 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.