As the previous years, the
International Focus Group for Integration (IFG for Integration) conducted its annual survey for SAP Process Integration, SAP Cloud Platform Integration Suite and topics around SAP integration. The survey was scheduled from May till September 2020.
Again many thanks to all participants from all five continents that replied to our survey!
The complete survey results were forwarded to all participants who included their email address in the survey registration.
Used abbreviations:
CPI |
SAP Cloud Platform Integration |
PI |
SAP Process Integration |
PO |
SAP Process Orchestration |
Survey Results
The following section contains the first part of our survey. The numbers without percentage sign show the absolute number of responses.
Number of participants: 283
Participants per user group

PI/PO releases and CPI used in productive integration scenarios
(multiple selections allowed since different versions may be used in parallel)

Use of local Cloud Integration (CPI) runtime on SAP PI /PO 7.50

Scenarios for which CPI is used in addition to an existing SAP PI/PO environment

Plans to replace SAP PI/PO as integration platform mid to long term (1 to 4 years)

Plans to move any existing integration scenarios from SAP PI/PO to CPI

The second part of the survey results can be found in the blog
Results of the global Survey for SAP Integration 2020 – Part 2.