Technology Blog Posts by SAP
cancel
Showing results for 
Search instead for 
Did you mean: 
AndreasWehry
Associate
Associate
10,173

One of the benefits of using SAP BTP ABAP Environment is that updates and upgrades are applied by SAP to the systems in quite a high frequency and close to the corresponding release time.
Find the latest known schedule of Major Upgrade Windows and Weekly Maintenance Windows for 2025 in this blog post.

 

Major Upgrade Windows

As in 2024, the SAP BTP ABAP Environment will have 4 Major Upgrade Windows in 2025. These 24 hours of potential system unavailability are used to upgrade the systems to the next major version.
The events for the Major Upgrade Windows are harmonized between all SAP Cloud Products and scheduled for the following weekends:

Depending on the data center region, the 24 hours downtime will start/end at:

  • MENA: FRI 1 am - SAT 1 am UTC
  • APJ: FRI 9 pm – SAT 9 pm UTC
  • Europe: SAT 4 am – SUN 4 am UTC
  • Americas: SAT 10 am – SUN 10 am UTC

The upgrade of the free tier systems takes place on the Thursday before the respective weekend.

Please find the release schedule of the referenced UI5 versions in this blog post.

 

Weekly Maintenance Windows

Potentially every weekend, the SAP BTP ABAP Environment could use a downtime of 4 hours, to apply database updates, Hotfix Collections and other changes.
Depending on the data center region, the 4 hours downtime may start at:

  • MENA: FRI 5 pm UTC
  • APJ: SAT 2 pm UTC
  • Europe: SAT 9 pm UTC
  • Americas: SUN 5 am UTC

The update of the free tier systems takes place on the Thursday before the respective weekend.
The following events for the release 2511 are planned as Weekly Maintenance Windows in 2025:

  • Hotfix Collection 2 for Release 2511 (only for systems which belong to the pre-upgrade)
    October 31st, 2025
  • Hotfix Collection 3 for Release 2511 (only for systems which belong to the pre-upgrade)
    November 15th – 16th, 2025
  • Hotfix Collection 4 for Release 2511 | November 29th – 30th, 2025
  • Hotfix Collection 5 for Release 2511 | December 13th – 14th, 2025
  • Hotfix collection 6 for Release 2511 | January 17th - 18th, 2026

 

Reduction of Planned Maintenance Windows

We introduced Downtime-optimized Upgrades and Hotfix Collection Imports for Production with release 2502. For the next steps about the Reduction of Planned Maintenance Windows for HFC Imports and Upgrades see our roadmap

 

Client Safety of CDS and AMDP

To support client-safe implementation please read Client Handling in ABAP - SAP Community for an overview.
Technical background is provided in SAP Note 3472859 - AMDP: How to make AMDP methods client-safe.

Please adopt these recommendations. SAP will turn today's warning messages into error messages with the upgrade to release 2508, which is planned for August 2025.

 

Cloud System Notification Subscriptions (CSNS)

Please register to Cloud System Notification Subscriptions (CSNS) in SAP for Me to get important information about planned and unplanned downtimes:

  • Access to Cloud System Notification Subscriptions (CSNS): https://me.sap.com/systemsprovisioning/getNotified
  • Find more information about Cloud System Notification Subscriptions (CSNS) in this documentation
  • To find the SAP BTP ABAP Environment entry select:
    Cloud Service: SAP BTP ABAP environment
    Solution Area: SAP Build

 

References

11 Comments