Hi Experts,

We are following two ways for updating demand for material in SAP. One is through MC94 and other one is from MD61.

My question are,

1 - If we have monthly schedule with us and we are updating through MD61. What are possible settings for MRP run and MRP1, MRP2, MRP3 and MRP4 views.

2 - How we can delete old demand that are showing in MD04 at material level not plant level.

Please advice.

View Entire Topic
Amit_SAP
Active Contributor
0 Likes

Hi,

1. MRP type, MRP controller, Lot size, Procurement type, schedule margin Key, Safety stock, selection method, Individual/collective requirement etc it depends upon business which ever field is required and you want to utilize that functionality.

2.You can delete manually in MD04 , Remove demand from MD62 ,

https://archive.sap.com/discussions/thread/2154141

Regards,

Amit

Former Member
0 Likes

There were some error in posting date while deleting demand. It is done now. And yes I followed your ans#2 for this.

For first question I knkow these settings are required but I just want to know the best combinatio of MRP type and Lot Size?

PD with EX or PD with (MB/WB/TB)??

Thanks for your support.

Amit_SAP
Active Contributor
0 Likes

It depends upon business which lot size they want to use.

EX- Lot for Lot

MB - Monthly --> In this requirement of whole month will be clubbed together

Same as other lot sizes.

Regards,