on ‎2018 Nov 20 10:11 AM
Hello,
i create a network with one supplier. I define this supplier in the location md as attribute location type ="V".
but the heurisitk stopped the run with an error called "Execution of the SCM operator was skipped because the data validation for the algorithm type HEURISTIC failed."
If I change the location type as "Supplier" the heuristik is running, but the result in the kf "Transport receipts are empty. For me, the system ignore, that I have a supplier in the network
Request clarification before answering.
Hello,
I have now a solution:
1. In the Location Source master data, following needs to be maintained:
Ship-From Loc.ID = SUP001
Location ID = PL1000
Product ID = Kom001
Location Sourcing Ratio = 1
2. In the Location Product master data, following needs to be maintained:
Location ID = SUP001
Product ID = Kom001
Subnetwork ID = UnendlicheHeuristik
3. In the Location master data, for SUP001, Location Type was set to VN, but needs to be maintained as V.
and then I see in the KF external procurement the values for the supplier
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 17 | |
| 16 | |
| 3 | |
| 3 | |
| 2 | |
| 2 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.