Hi all,
As known, there are 3 types of POrg in SAP.
1- Client level/Corporate-Wide/Centerlized POrg. Responsible to purchase for all company codes.
Assignment required: Assign POrg to all required plants under the different company codes. No CoCd assignment required in this type.
2- Company Code Specific POrg. Responsible for buying material and service for all plants of a particular company code.
Assignment required: Assing POrg to single CoCd + assign POrg to the required plants under this CoCd.
3- Plant-Specifc/Decentralized POrg. Responsible for buying materials and services for a single plant.
Assignment required: Assign POrg to only single/one plant + assign POrg to CoCd of that plant.
-----
I wrote above forms of POrg to give you a picture of what I understood.
My question is:
Is above relationships/assignments of the different types of POrg correct?
Also, for the client level/Centralized POrg assignment, I wrote the required assignment for this form is to assign POrg to all reuired plants. But what if I leave the existing POrg without assignment!!
I noticed that even though I leave the POrg without assignment, i can create PO. so,
Client level/Centralized POrg assignment could be done by assigning POrg to all plants or leaving the POrg without assignment?
This is correct?
Sorry for typing this much of words. I hope somebody can assist me on this. Thank you
Request clarification before answering.
User | Count |
---|---|
4 | |
3 | |
2 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.