Unable to reach BaDI /SAPAPO/CURTO_CREATE Method BEFORE_SAVE through CURTOADV_CREATE

PauloRRamalhoG
Explorer
0 Likes
396

Hi,

 

We are implementing ePP/DS in SAP S/4HANA Edition 2021 Sp3.

We had assembled in our routing 2 operations, each one with respective work center, same productivity, with mandatory overlapping and included it, together with respective BOM, into a Production Version of a code in PP/DS.

When we try to transform it into an ePP/DS EDP, the activities relationships remain with a soft constraint, named "Minimum Constraint" (CONSTRAINT_SUBTYPE = 0) on start-start and finish-finish relationships among them (attachment "minimun constraint.jpg"). This is default constraint in PP/DS using routings.

Our goal is to set "Minimum constraint = Maximum constraint=0" value in CONSTRAINT_SUBTYPE. (attachment  "equal constraint.jpg")

We were trying to reach it through advise of SAP Note 1873307, which set a way through BaDI /SAPAPO/CURTO_CREATE Method BEFORE_SAVE: however, when we use the tcode CURTOADV_CREATE, the only BaDI on track seems to be CUSLNTRTO_ADDIN.

Do you know a way to reach, while executing CURTOADV_CREATE, to reach BaDI /SAPAPO/CURTO_CREATE ?

SAP Support did not answer that to us.

 

Best Regards,

P.R.