2025 Feb 27 3:08 PM - edited 2025 Feb 27 6:05 PM
Hi,
We are implementing ePP/DS in SAP S/4HANA Edition 2021 Sp3.
We had assembled in our routing 2 operations, each one with respective work center, same productivity, with mandatory overlapping and included it, together with respective BOM, into a Production Version of a code in PP/DS.
When we try to transform it into an ePP/DS EDP, the activities relationships remain with a soft constraint, named "Minimum Constraint" (CONSTRAINT_SUBTYPE = 0) on start-start and finish-finish relationships among them (attachment "minimun constraint.jpg"). This is default constraint in PP/DS using routings.
Our goal is to set "Minimum constraint = Maximum constraint=0" value in CONSTRAINT_SUBTYPE. (attachment "equal constraint.jpg")
We were trying to reach it through advise of SAP Note 1873307, which set a way through BaDI /SAPAPO/CURTO_CREATE Method BEFORE_SAVE: however, when we use the tcode CURTOADV_CREATE, the only BaDI on track seems to be CUSLNTRTO_ADDIN.
Do you know a way to reach, while executing CURTOADV_CREATE, to reach BaDI /SAPAPO/CURTO_CREATE ?
SAP Support did not answer that to us.
Best Regards,
P.R.
Request clarification before answering.
| User | Count |
|---|---|
| 17 | |
| 16 | |
| 3 | |
| 3 | |
| 2 | |
| 2 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.