Due to memory limitations, we need to split running a 5 year heuristic into two runs. The issue is that the 2nd run, which starts in a future month, does not use the projected stock from the previous period, it used the onhand stock (which is 0). Is there a way to have the heuristic use projected stock rather than onhand stock in the first period of the heuristic?
Help others by sharing your knowledge.
AnswerRequest clarification before answering.
Hi Susan,
Have you tried copying Projected stock of last period (1st run) as initial inventory for first period (2nd Run) and then taking the 2nd heuristic run stating future month as first period of heuristic run.
Thanks
Girish
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 17 | |
| 16 | |
| 3 | |
| 3 | |
| 2 | |
| 2 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.