on ‎2020 Sep 02 5:21 AM
Hi!
We running TLB as a background job every night. And last weeks we got error "The parallel process was interrupted with an error: An error occurred during calculations with timestamps. Calendar". Yes, this is a full text of the error. No. message /SAPAPO/SDP_PAR022.
We don`t know which calendar is caused the issue. Because of the error we don`t get some orders.
But if we run TLB in the morning or in the afternoon with the same parameters, we don`t get this error. It appears only at night.
I didn`t find a solution in SAP Notes or other sources. I think if we`ve got problem with some calendar than why TLB works fine in the morning?
Where should I look at?
Help others by sharing your knowledge.
AnswerRequest clarification before answering.
Hello,
Please refer SAP knowledge base article on it,
2353783 - Error: Timestream not generated for year 1970
2458204 - Time stream (xyz) not generated for year xyz (future)
In transaction /SAPAPO/CALENDAR and enter the time stream mentioned in the error text and press "Change". then Press button "Calculate Periods" and save.
.In case a problem related to the factory calendar is shown please extend the factory calendar which is assigned in the time stream in transaction SCAL.
Best Regards,
T.Brahmankar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello.
Thank you for reply.
The error didnt show what calendar/time stream caused the problem. So I generated all time streams we use. Problem solved 🙂
| User | Count |
|---|---|
| 12 | |
| 7 | |
| 4 | |
| 3 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.