Hi All,

I have question regarding the POSC in the replenishment process.

As an requirement we need to map the replenishment using the POSC as repacking needs to be performed as an intermediate steps.

the storage process gets triggered with replenishment and product goes to the intermidate workcenter for repacking. but for the final putaway in the estination bin system does not take into account the bin selected udring the replenishment execution but again determines based on the WPT assinged to the step in the storage control.

Does anyone know what can be done in order to use the bin selected for replenishment as a destination bin.

juergen.pitz Hello Juergen your valuable insight would be very helpful.. Thanks!!

View Entire Topic
JuergenPitz
Product and Topic Expert
Product and Topic Expert

Hello atul.diwakar.joshi ,

I had to set this up first to test it. But at least with a replenishment for fixed bins, that worked for me with POSC.

" but again determines based on the WPT assinged to the step in the storage control."

Of course you should NOT use then a WPT with a destination storage type / bin. I entered in the POSC settings a WPT without assignment and just the storage type, the bin was read from the fixed bins assignment. I have not tested with a storage type without fixed bins... wait, that of course also works.

LOSC would not be the good choice when you want to repack. But " If system has picked partial HU then LOSC won't work." - is of course wrong. Also with partial HU picks you can use LOSC, you only need to create a pick HU during the pick step.

Brgds

Juergen

---

All the above is no official SAP statement.

Want to learn EWM?

Check for EWM courses: https://training.sap.com/trainingpath/Applications-Extended+Warehouse+Management-EWM+in+S4HANA

Get a SAP Learning Hub Subscription: https://training.sap.com/learninghub

And it is EWM. NOT eWM - Duh!

And if your question includes the word "transfer order" - do NOT tag the question with Extended Warehouse Management!

former_member788724
Contributor
0 Kudos

Hello Juergen

For LOSC:

I put my comments as per SAP note 2807808. as per this note- LOSC can work with partial HU removal only with pick point scenarion. as for as I know, pick WT will be always product WT. Let's know if we can also have pick WT as HU WT . I am particularily talking about OB01 step.

I need to test if LOSC really works if we setup pick HU creation while creating pick WT itself (Here I won't setup pick point).

Regards

ASLAM

former_member788724
Contributor
0 Kudos

Hello Juergen

Please also let us know the POSC behavior when we have crate part or KANBAN synchronous WT replenishment. I tested and found that system is not taking the destination bin as maintained in KANBAN CC or /SCWM/PSASTAGE.

I put only storage type in POSC last step OBK3 (Customized one). I checked with both rule based check ON and OFF with only storage type maintained.

former_member788724
Contributor
0 Kudos

Hello- more screehshots

former_member788724
Contributor
0 Kudos

Screenshots

Atul_Joshi
Explorer
0 Kudos

Hello Juergen,

Thanks for reply with analysis.

Yes so the destination bin got determined based on the WPT in the POSC and not the one determined in replenishment transaction. and system does not consider the bin selected during replenishment run.

Yes LOSC didn't help because we need to do repacking.

So this in line with my observation and understanding of the standard behavior.

Thanks again for confirmation.

Regards,