Dear experts
In SAP version 2023, we have some finished products managed with strategy 40.
We have set the masterdata to be able to consumume the STO. Mixed MRP is 1 and the consumption indicator for planning requirements is 3. =>therefore when STO is planned it reduces the PIRs.
But when the delivery is created and after the post good issue the PIR reduction disappear and the WIThdrawal Qty MD73 is not updated.
There is the note
Stock transfer: Control the reduction of Planned Independent Requirements
but it doesn't help enough. In one hand the notes says
In the Customizing 'Assignment of Requirement types to Transaction' (Transaction OVZI) the field 'Origin of
requirement type in requirement type determination' is empty for the delivery item category and material MRP type
combination. If the value of this field is blank, the settings from the standard requirement class/type, assigned to the
planning strategy defined in the material master, will be considered.
In this case, the stock transfer will behave as a the sales order and reduce PIR
In other hand the notes says
For the STO delivery item category and MRP type combination you should Assign the value '1' to the field 'Assignment of
Requirement types to Transaction'. That way system will consider the requirement type defined here during the PIR reduction,
instead of the requirement type linked to the material master strategy.
HERE BELOW OUR SETTINGS
OVZI setting FOR THE ITEM DEL CAT
THANKS IN ADVANCE FOR YOUR SUPPORT
Request clarification before answering.
User | Count |
---|---|
6 | |
5 | |
4 | |
2 | |
2 | |
2 | |
2 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.