Business use Decentralize EWM and have two EWM sloc (0001 main wh, 0002 production wh). So now we have stock in both 0001, 0002. Now I need a the Production material request to pick the material either from 0001 or from 0002. How to set the master data for this. In control cycle for ewm staging its not possible to maintain the different destination and source storage location.
Is there any control we can do in /n/SCWM/PSASTAGE to stage material either from 0001 main warehouse or 0002 production warehouse.
Also on releasing the process order the components is not allowed to have different storage location than the PSA assigned to it. How to achieve this. How business will do the ATP by considering the stock from different sloc.
Request clarification before answering.
| User | Count |
|---|---|
| 17 | |
| 16 | |
| 4 | |
| 3 | |
| 2 | |
| 2 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.