cancel
Showing results for 
Search instead for 
Did you mean: 
Read only

Staging / Picking materials from different EWM sloc to single Production storage location

RaghavanKathamuthu
Active Contributor
0 Likes
298

Business use Decentralize EWM and have two EWM sloc (0001 main wh, 0002 production wh). So now we have stock in both 0001, 0002. Now I need a the Production material request to pick the material either from 0001 or from 0002. How to set the master data for this. In control cycle for ewm staging its not possible to maintain the different destination and source storage location.

RaghavanKathamuthu_1-1765277763025.png
Is there any control we can do in /n/SCWM/PSASTAGE to stage material either from 0001 main warehouse or 0002 production warehouse.
Also on releasing the process order the components is not allowed to have different storage location than the PSA assigned to it. How to achieve this. How business will do the ATP by considering the stock from different sloc.

Accepted Solutions (0)

Answers (0)